Новое поступление
Характеристики
*Текущая стоимость уже могла изменится. Что бы узнать актуальную цену и проверить наличие товара, нажмите "Добавить в корзину"
| Месяц | Минимальная цена | Макс. стоимость | Цена |
|---|---|---|---|
| Mar-18-2026 | 0.0 руб. | 0.61 руб. | 0 руб. |
| Feb-18-2026 | 0.98 руб. | 0.81 руб. | 0 руб. |
| Jan-18-2026 | 0.53 руб. | 0.0 руб. | 0 руб. |
| Dec-18-2025 | 0.54 руб. | 0.75 руб. | 0 руб. |
| Nov-18-2025 | 0.57 руб. | 0.71 руб. | 0 руб. |
| Oct-18-2025 | 0.61 руб. | 0.57 руб. | 0 руб. |
| Sep-18-2025 | 0.77 руб. | 0.2 руб. | 0 руб. |
| Aug-18-2025 | 0.85 руб. | 0.66 руб. | 0 руб. |
| Jul-18-2025 | 0.62 руб. | 0.81 руб. | 0 руб. |
Описание товара




About Us
We, Shenzhen Halnziye Electronics Co., Ltd. are senior Thermal interface material manufacturer in China for years, our main products are heat sink compounds & heat sink plaster & heat sink flow and thermal pad, our products are widely used in CPU&VGA, LED, IC home appliance etc, with great operating property of our products (all products got SGS, RoHS,SVHC,PFOA certification), and our main markets are EU, north America, Northeast Asia, Southeast Asia etc, Learn more about us @ our website, I believe you will find what you want to order with the best cost performance.
Key Specification
HY600 Thermal Conductive Grease/CPU Silicon Thermal paste
Brief Description
Color Gold.
Silicone based thermal grease
Operation temperature -30~240°C, peak up to 280°C
Thermal conductivity 3.05~3.76W/m-K
Features
HY600 Gold Thermal Grease Specially produced for DIY,with 45% pure gold and
Better heating performance than regular Thermal Grease .Your first choice heat material
with over clocking
RoHS&PFOS&REACH appliant with SGS testing report.
Many types of packages with different weight to fullfill your diversified requirments
| Items | HY610 | HY620 | HY630 | HY650 | Units |
| Color | Gold | Gold | Gold | Gold | NO |
| Thermal Conductivity | 3.05 | 3.34 | 3.57 | 3.76 | W/m-K |
| Thermal Impedance | 0.073 | 0.038 | 0.018 | 0.051 | 0C-in2/W |
| Specific Gravity | 2.48 | 2.57 | 2.61 | 2.68 | g/cm3 |
| Evaporation | 0.001 | 0.001 | 0.001 | 0.001 | % |
| Bleed | 0.05 | 0.05 | 0.05 | 0.05 | % |
| Dielectric Constant | 5.1 | 5.1 | 5 | 5.1 | No |
| Thixotropic Index | 380+/-10 | 380+/-10 | 300+/-10 | 300+/-10 | 1/10mm |
| Moment Beared Temperature | -50~280 | -50~280 | -50~280 | -50~280 | 0C |
| Operation Temperature | -30~240 | -30~240 | -30~240 | -30~240 | 0C |
HOW TO USE
a.Clean the CPU and heat sink surfaces,Wipe the surface lightly with a cotton ball or cotton swab dampened with alcohol or our thermal cleanser
b.Place a tiny drop of thermal grease to the center of the cooler base,smear it evenly with scraper or finger cot,best
thickness is 0.13~0.15mm
c.Attach the heat sink to the processor and Avoid removing the heat sink after installing it.
Package&weight: 1g/ Slim syringe
Storage: Store in cool and dry place, the shelf life is 24 months (<=25°c).
Express service available:
Hongkong EMS: 5~7 working days
DHL: 3~5 working days
TNT:3~5 working days for WestEU/North America, 5~7 working days for most Japan/South Korea/Singapore etc,
10~20 working days for most of Asia,South America and Africa countries.
FAQ
1>Lead time:
Less than or be equal to 1000pcs In 3 working days;other quantity depends on arranging of our factory.
2>Delivery period: 3~5 working by Express door to door service and airport to airport service, if by China post or Hongkong post , it depends on schedule and destination, will be 15~25 days.
3>All message will be answered in 12 hours, if you do not receive our reply,please send it again and we will reply as soon as possible.
4>Any other question ,no hesitate to contact us
Feedback
Express service available:
Hongkong EMS: 5~7 working days
DHL: 3~5 working days
TNT:3~5 working days for WestEU/North America, 5~7 working days for most Japan/South Korea/Singapore etc,
10~20 working days for most of Asia,South America and Africa countries.
FAQ
1>Lead time:
Less than or be equal to 1000pcs In 3 working days;other quantity depends on arranging of our factory.
2>Delivery period: 3~5 working by Express door to door service and airport to airport service, if by China post or Hongkong post , it depends on schedule and destination, will be 15~25 days.
3>All message will be answered in 12 hours, if you do not receive our reply,please send it again and we will reply as soon as possible.
4>Any other question ,no hesitate to contact us
Feedback

Смотрите так же другие товары:
Specification